Helion Energy

Computational Plasma Research Summer 2027 Intern

Helion Energy · Everett, WA
Everett, WA Intern Posted 2026-09-30
Type
Internship
Experience
0-1 yr

About Helion

We are a fusion power company based in Everett, WA, with the mission to build the world's first fusion power plant, enabling a future with unlimited clean electricity. Our vision is a world with clean, reliable, and affordable energy for everyone.

Since Helion's founding in 2013, we have raised $1.5 billion from long-time investors such as Sam Altman, Mithril, and Capricorn Investment Group as well as new investors including Thrive Capital, LightSpeed Venture Capital, SoftBank, and others to propel us forward. Our current prototype, Polaris, has reached record-breaking plasma temperatures of 150 million degrees Celsius (13 keV). Helion is continuing to iterate and on the path to the world's first fusion power plant, Orion.

This is a pivotal time to join Helion. You will tackle real-world challenges with a team that prizes urgency, rigor, ownership, and a commitment to delivering hard truths – values essential to achieving what no one has before. Together, we will change the future of energy, because the world can't wait.

What You Will Be Doing:

The computational research team at Helion works with multiple plasma simulation codes to simulate and analyze Helion’s fusion machines and test beds. The goal of the simulation effort is to develop predictive computational capabilities derived from first principles, validated against experimental data across multiple FRC merging devices, to inform next-generation fusion machine design.

You Will:

  • Be responsible for using Helion’s computational suite of tools to study a particular aspect of the machine, which could include FRC formation, translation, merging, or compression
  • Work with your team and mentor to develop a simulation study and develop a set of results
  • Develop a report and present your findings to the broader research team at Helion

Required Skills:

  • Ability to work full time, onsite in Everett, WA for a minimum of 12 consecutive weeks during summer 2027
  • Currently pursuing a PhD in Physics, Aerospace Engineering, or a related field, with relevant experience in plasmas
  • Must be able to complete their PhD program and commence full-time employment no later than May 2028
  • GPA of 3.0 or above
  • Experience working with plasma simulation codes (e.g. PIC, Vlasov codes, MHD)
  • Experience doing research in a team environment
  • Scripting and analysis in Python, C++ or MATLAB

#LI-Onsite #LI-TM1

PythonC++
Helion Energy

Helion Energy

Fusion Energy · Private · Everett, USA

Stage & Valuation
Private · $15.5B
Key Investors
Sam Altman, Mithril, Thrive Capital
Open roles on NewJob
Most hiring in
Engineering (48) · Operations (4) · Marketing (3)
Helion Energy develops magneto-inertial fusion technology to build the world's first commercial fusion power plant. The company focuses on producing clean, reliable, and abundant electricity directly from fusion using a pulsed design with helium-3 fuel.
Fusion Energy Renewable Energy Deep Tech
E
Director of Engineering, Modules
Everett, WA
Engineering
$272K–$320K
E
Director of Experimental Science
Everett, WA
Engineering
$289K–$315K
O
Senior Director of Build
Everett, WA
Operations
$249K–$291K
See all 60+ roles at Helion Energy →
C
(University of Alabama) INTERN - Hypersonic Research Engineer – M&S Summer 2027
CFD Research Corporation Huntsville, AL
Engineering
I
Quantitative Research Intern (BS/MS) - Summer 2027
IMC Financial Markets Chicago, IL
Engineering
K
Simulation Software Engineering Intern - Summer 2027
K2 Space Corporation Los Angeles, CA
Engineering
$62K–$83K
S
Summer 2027 - Software Engineer Intern
Shield AI San Diego, California
Engineering
$76K–$201K
See all Engineering roles →

Interested in this role?

Apply directly on the company site — no recruiter middleman, no account required.

Apply now →
Apply on company site